The solution for designing cost efficient and low-impact infrastructure projects.
Starter
โฌ0/month*
Starter plan features:
-
Access exhaustive map of construction material suppliers
-
Get logistics information to/from your project or plant
-
Assess the costs and global warming potential of sourcing and transporting materials
-
Perform assessments with default truck parameters showing limited results
- 5 construction materials per project
- Default truck parameters for transportation calculation: 27 tons load capacity, diesel fuel type, 8 hours per day, 25 minutes loading/unloading duration
- Results limited to 3 production sites results per material)
Expert
โฌ125/month*
Everything in Advanced, plus:
-
Perform assessments with customizable truck parameters showing all results
-
Create/model your private or scheme dedicated (temporary) production sites
-
Include your private/temporary created production sites in your assessments
-
Group and combine your assessments into portfolios
-
Compare your assessments and portfolios
Advanced Business Intelligence Dashboard
-
Conduct in-depth analysis of your results
Advanced Business Intelligence Dashboard
*Per member/month billed annually
Full list of features
Starter
Advanced
Expert
Enterprise
Materials Map
Easily find construction material suppliers
โ
โ
โ
โ
Discover reachable areas easily with isochrone feature
โ
โ
โ
โ
Create/model your private or scheme dedicated (temporary) production sites
โ
โ
Include your private/temporary created production sites in your assessments
โ
โ
โ
โ
Import your own map layers (in KML format)
โ
โ
Material Assessment
Enter construction materials mix or bill of quantity in a geolocated project context
Limited results
โ
5 construction materials per project
Unlimited
Unlimited
Unlimited
Understand the accessibility of different locations based on distances or travel time
โ
โ
โ
โ
Truck parameters customizations (truck type, parameters and constraints) for transportation calculations
Default values
โ
27 tons load capacity, diesel fuel type, 8 hours per day, 25 minutes loading/unloading duration
Default values
โ
27 tons load capacity, diesel fuel type, 8 hours per day, 25 minutes loading/unloading duration
โ
โ
Assess the impact on costs, global warming potential, and material consumption
Limited Results
โ
3 production sites results per material
All Results
All Results
All Results
Connect your BIM models with Autodesk Civil 3D connection
โ
โ
โ
Dashboard of results
โ
โ
โ
โ
Access your previous assessments (history)
โ
โ
โ
Portfolios and In-Depth Analysis
Group and combine assessments into portfolios
โ
โ
Compare your assessments and portfolios โ
โ
โ
Conduct in-depth analysis of your results โ
โ
โ
Collaboration
Create workspaces
โ
Manage users access in your workspace
โ
Work on projects in a collaborative mode (share private sites, assessments and portfolios)
โ